Drywall Contractor Insurance by State

Mississippi Drywall Contractor Insurance

Mississippi licenses commercial drywall work through a contractors board specialty, licenses home remodelers above a cost line, certifies lead-safe renovation firms through its own environmental department, adopts the federal asbestos standard and requires workers’ compensation of the employers its law covers.

A worker in a cap and plaid shirt fits a large drywall sheet against a wall in a commercial interior with metal framing behind.

Whether a Mississippi drywall job needs a state license depends less on the trade than on the size of the contract and the kind of building. The Mississippi State Board of Contractors has a commercial specialty for metal studs and hung and finished board that applies once a contract reaches the commercial law’s line, and it licenses home remodelers once a job’s cost passes a separate residential line. Lead-safe renovation is the state’s own program, run by the Mississippi Department of Environmental Quality, and its rule counts the removal of walls and ceilings as renovation. The asbestos rules adopt the federal standard and certify abatement in schools, public buildings and commercial buildings, and workers’ compensation is compulsory for the employers the law covers, with no state fund to buy from.

The thresholds appear below only in the words of the sources that set them. How the policies themselves work for a drywall business is on the drywall contractor insurance page. This page keeps to what is particular to Mississippi, whether your crews repair walls in lived-in houses, the subject of the residential drywall contractor insurance page, or frame and board out offices and stores under a general contractor, which the commercial drywall contractor insurance page takes up.

The state’s own lead-safe renovation rule as a cascade: which Mississippi drywall jobs it reaches, what it counts as renovation, and the certificate and notice that follow.

A cascade read from top to bottom, where each step keeps only the jobs the step above it passes down. At the top is paid work in older housing or in a facility children use, the buildings the Commission’s lead rule names in its scope. The next step asks whether the job disturbs paint, and the environmental department says such buildings are typically regulated when any paint is disturbed. Jobs that disturb paint fall to the next step, which asks whether the work is renovation as the state rule defines it; the definition takes in work that modifies the structure and names the removal of walls and ceilings among it. Renovation work then needs the firm to hold the Commission’s certification, with a certified renovator on the job. At the bottom, the department asks for a project notification before the regulated work starts. No figures are shown.

Before the first painted sheet comes down: firm certification and a project notice

Mississippi runs its own lead-safe renovation program in place of EPA’s. EPA lists Mississippi among the states it has authorized to run the renovation, repair and painting program, and the Mississippi Department of Environmental Quality says it was authorized to enforce the renovation rules in the state. The Commission on Environmental Quality’s rule requires firms that perform or offer the regulated work in older housing and child-occupied facilities to hold the Commission’s certification.

Authority: 11 Miss. Admin. Code Pt. 2, Ch. 9, R. 9.1, 9.2(EEE), 9.4(L)(1); Miss. Code Ann. §§ 49-17-501 through 49-17-531

The lead finding comes first because it reaches the most ordinary drywall work. Cutting out a stained section, opening a wall for a doorway and sanding a patch flush all disturb whatever paint is on the wall. The department’s guidance gives the building age the program turns on:

“Residential Buildings and Child-Occupied Facilities built before 1978 are typically regulated when any paint is disturbed.”

For a drywall crew, the most useful words are in the state rule’s definition of renovation, which names exactly what a tear-out crew does:

“… the removal of building components (e.g., walls, ceilings, plumbing, windows) …”

A drywall firm paid to cut out, patch or tear out painted walls and ceilings in older homes or child-occupied facilities needs the state’s firm certification and a certified renovator, and the department asks for a project notification before the regulated work starts; the state rule’s definition of renovation names the removal of walls and ceilings.

The certification sits with the firm, not only with the person holding the scraper:

“… all firms which perform or offer to perform any of the lead-based paint activities described in Rule 9.5 must be certified by the Commission.”

The step that is easiest to miss is the notice, and the department states its lead time:

“When regulated activities are to occur, a Lead-Based Paint Project Notification must be submitted six (6) working days prior to the start of the regulated activities.”

As advice, put the year the building went up on the estimate sheet, keep the firm’s certificate and the renovator’s card current, and build the notice period into the schedule. How a liability policy treats a claim involving lead is taken up on the general liability page.

Metal studs, hung board and finish coats in a commercial specialty license

The Mississippi State Board of Contractors licenses drywall work through a commercial specialty classification, Acoustical and Drywall Treatment, which covers metal stud partitions and the hanging and finishing of drywall board; lathing, plastering and stucco is a separate classification that requires an exam. On homes, the Board licenses residential builders and remodelers once a job passes the cost line the residential law sets, and it lists no separate drywall classification for residential work.

Authority: Miss. Code Ann. §§ 31-3-1, 31-3-15; §§ 73-59-1(c), 73-59-3(1); Mississippi State Board of Contractors, Classifications

The commercial specialty that fits a drywall business starts at the framing and runs through the finish:

“A specialty classification that involves installation of metal studding for interior partitions in connection with dry wall application and the application and finishing of dry wall board, including sprayed finishes.”

A business that only hangs and tapes fits it, and so does a business that sets the partition studs first. Plaster is handled differently, as a separate specialty the Board marks as requiring a test:

“A specialty classification that involves installation, maintenance, or repair of all plastering or stucco involving interior and/or exterior walls including but not limited to exterior insulation finish systems, swimming pools, etc.”

As advice, if your crews patch plaster or repair stucco on commercial jobs as well as hanging board, settle with the Board which classifications your license should carry before you bid work that mixes them.

The Board’s certificate at bid time, and the dollar line below which it is not needed

The commercial license does not reach every job. The statute’s definition of a contractor carries an exception for smaller contracts, stated in dollars:

“… where such contract, subcontract or undertaking is less than Fifty Thousand Dollars ($50,000.00);”

For jobs at or above that line, the statute ties the certificate to the moment the bid goes in, not the day the crew arrives:

“No contract for public or private projects shall be issued or awarded to any contractor who did not have a current certificate of responsibility issued by said board at the time of the submission of the bid”

A business that waits to apply until it has won a large job has already missed the moment the certificate was needed. As advice, hold the classification before you bid at that size, and on jobs priced near the line keep the contract value and every change order in the job file. The proof of insurance a general contractor asks for on those jobs is set out on the commercial drywall contractor insurance page.

On houses: remodelers above a cost line, and the trades licensed at any price

Homes run under a different law with a different line. The residential law calls a business a remodeler when it takes on improvements to an existing home above a stated cost:

“… undertakes or offers to undertake the construction, or superintending of the construction, of improvements to an existing residence when the total cost of the improvements exceeds Ten Thousand Dollars ($10,000.00).”

What matters for a drywall sub is the same law’s list of trades that need a license at any price on a home. It opens this way, and the list that follows names electrical, plumbing, mechanical, and heating, ventilation and air conditioning work:

“Any subcontractor, of any tier, performing the following work or within the following trade, on any residential construction or residential improvement project, no matter the dollar amount of the construction or improvements:”

Whether a particular drywall job needs the Board’s license turns on the contract. The commercial law leaves contracts below the dollar line in its definition of a contractor outside the license, and the residential law licenses remodelers above its own line while naming only electrical, plumbing, mechanical and heating and air conditioning subcontractors for licensing at any contract size. Check the contract amount and the kind of building against the Board’s classifications before bidding, and check the city or county where the work is done for its own permits.

Put together, the residential findings sort a drywall business by whom it signs with. A crew finishing for a builder on a house works in a trade the any-price list leaves out; a business contracting directly with a homeowner above the line is the remodeler the law describes. As advice, weigh the remodeler license before a large homeowner job forces the question, and check the city or county where each house sits for its own permits.

Schools, public buildings and commercial space: where the asbestos certificate is required

Mississippi’s asbestos rules, written by the Mississippi Commission on Environmental Quality and run by the Department of Environmental Quality, adopt the federal asbestos air standard by reference and add the state’s own certification rule for asbestos abatement in schools, public buildings and commercial buildings. Neither rule names joint compound, wallboard or plaster; they reach those materials through the federal categories of friable and regulated asbestos-containing material, and the department’s guidance names ceiling texture and transite wallboard among the places asbestos is found.

Authority: 11 Miss. Admin. Code Pt. 2, Ch. 1, R. 1.8(A); 11 Miss. Admin. Code Pt. 2, Ch. 10, R. 10.1, 10.2(C), (D), (Z), 10.3(A); 40 CFR 61.141 (40 CFR Part 61, Subpart M); Miss. Code Ann. §§ 37-138-1 et seq.

The state reaches asbestos through rules that work together. The air rule takes in the federal hazardous air pollutant standards by reference:

“Hazardous air pollutant emission standards are National Emission Standards for Hazardous Air Pollutants duly promulgated by the U. S. Environmental Protection Agency in (or to be printed in) 40 C.F.R. Part 61 …”

The adopted federal text decides which materials are regulated by how a material behaves under the work, not by what it is called:

“Regulated asbestos-containing material (RACM) means (a) Friable asbestos material … or (d) Category II nonfriable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material …”

That definition carries the point for anyone who sands, cuts or demolishes finished walls: a material that does not crumble by hand can still be regulated if the work is likely to crumble it, so the method a crew picks is part of the test. The state’s own certification chapter then says who may do abatement work in certain buildings:

“No person shall engage in any asbestos project in a school building, public building, or commercial building as an inspector, management planner, project designer, air monitor, contractor, supervisor, or worker …”

Neither rule names joint compound, wallboard or plaster; they reach those materials through the categories above. Small homes sit outside the adopted federal definition of a facility, in its own words:

“Facility means any institutional, commercial, public, industrial, or residential structure, installation, or building (including any structure, installation, or building containing condominiums or individual dwelling units operated as a residential cooperative, but excluding residential buildings having four or fewer dwelling units);”

What the department’s guidance adds: ceiling texture, wallboard and the house exemption

The Mississippi Department of Environmental Quality asbestos program publishes guidance that is more concrete than the rules. It is guidance, not the text of either rule, and it names materials a drywall crew handles or works around:

“Asbestos is also often found in other building materials including floor tile, ceiling texture, and transite wallboard.”

For a crew opening an older ceiling, that sentence is a reason to ask what the material is before the work, not proof that a particular ceiling contains asbestos. Only an inspection answers that. The guidance also restates the home exemption and then marks its edge:

“Exemptions: Demolition and renovation activities associated with individual residences, including residential buildings with four or fewer dwelling units, generally are exempt from the requirements of MDEQ asbestos regulations.”

“A residential structure does not qualify for the exemption when:”

The list after that sentence names a development project involving more than a single small residential building on a site, so a crew hired by a developer to redo several houses at once should not assume the exemption travels with it. As advice, on a renovation in a school, public building or commercial building, ask the owner for the asbestos inspection before you price demolition, and if regulated material has to come out, schedule a certified abatement contractor first. Whether a liability policy responds to an asbestos claim is taken up on the general liability page.

The Commission’s headcount line, and the choices below it

Workers’ compensation is compulsory in Mississippi for employers the law covers, and the Workers’ Compensation Commission’s facts document draws the line at a small number of regularly employed workers, below which coverage is voluntary. A covered employer buys a policy from an insurance company or obtains the Commission’s approval to self-insure, alone or in a group; the Insurance Department lists an assigned risk pool among its markets of last resort, and no source read describes a state fund.

Authority: Miss. Code Ann. §§ 71-3-1 et seq., 71-3-75; Mississippi Workers’ Compensation Commission Rules, Title 20, Part 1, R. 1.3, 1.7

The Mississippi Workers’ Compensation Commission states the line in its facts document, and what happens on each side of it:

“All employers with five (5) employees regularly employed are required to provide workers' compensation insurance coverage.”

“If the employer has less than five (5) employees, workers' compensation coverage is not mandatory but may be provided voluntarily by the employer.”

A covered employer meets the law with insurance or with the Commission’s approval to carry the risk itself:

“An employer covered by the Law is required to secure the payment of workers' compensation benefits to its employees by purchasing workers' compensation insurance from an insurance company or by obtaining approval from the Commission to self-insure.”

The point that matters most on a drywall payroll is the subcontractor line:

“… independent contractors are ordinarily excluded from coverage although special protection is given to employees of subcontractors.”

As advice, read that sentence from both ends. If you hire out taping or hanging, collect the other crew’s certificate before it starts, because its people can end up looking to you; if you are the sub, expect the general contractor to ask for yours. Hangers and tapers paid by the board or the job raise questions of their own, which the workers’ compensation page sets out. Nothing verified here crosses a state line, so crews working outside Mississippi meet that state’s comp rules.

Agency websites to bookmark before the next bid

The Mississippi Insurance Department regulates insurance in the state. You can look up an insurance agency’s license, ours included, on NIPR.com. The other state bodies behind this page each hold a separate piece of it, with each role as the record verified it:

Cities and counties issue their own permits, and no statewide list names those offices, so the permit office where each job sits belongs in your notes beside these.

Metros centered in the state, and a neighbor’s metro that reaches in

The metro areas below are the metropolitan areas that take in Mississippi counties, as the U.S. Census Bureau delineates them: those whose principal cities are in Mississippi first, then a metro centered across the state line. The Board’s license is statewide while permits are local, so a crew moving between jobs in a single metro can meet a different permit office at each stop.

Jackson, MS

Mississippi counties in this metro: Copiah County, Hinds County, Holmes County, Madison County, Rankin County, Scott County, Simpson County and Yazoo County.

Gulfport-Biloxi, MS

Mississippi counties in this metro: Hancock County, Harrison County, Jackson County and Stone County.

Hattiesburg, MS

Mississippi counties in this metro: Forrest County, Lamar County and Perry County.

Memphis, TN-MS-AR

This metro reaches beyond Mississippi, and this card names only its Mississippi counties: Benton County, DeSoto County, Marshall County, Tate County and Tunica County.

As advice, plan a metro as a set of separate places, and for a metro that crosses the state line, confirm which state’s rules govern the job before the bid goes out.

Turning a board license and a lead certificate into a policy set

The findings above tell you where Mississippi’s rules sit. The coverage that answers for the work is the set of policies a drywall business carries wherever it works, and each has its own page:

Which of those carry the most weight depends on the work you take, and the service pages take homes and commercial projects on their own terms. When you are ready to put the pieces together for work in Mississippi, a quote request is the place to start.

Mississippi: what the state sets for drywall work, what each rule leaves open, and the coverage page that discusses it.
Contractor license A state license or registration reaches drywall work
Injury and damage to others from the work, during the job and after it General Liability
Lead-safe renovation The state runs its own lead-safe renovation program
Paint dust disturbed when older walls are cut, patched or sanded General Liability
Asbestos in wall and ceiling material A state program reaches removal of this material
Disturbing older joint compound, wallboard or plaster General Liability
Workers’ compensation Required for covered employers, bought in the open market
A crew member hurt on the job Workers’ Compensation

State rules decide who may do the work and how; the policies decide who pays when something goes wrong.

  • A license, registration or certification is a requirement of the state, not insurance.

A panel for Mississippi in rows. Each row sets a requirement of the state beside the exposure that requirement leaves open and the coverage line that answers it. Contractor license: A state license or registration reaches drywall work. It leaves open injury and damage to others from the work, during the job and after it, which General Liability answers. Lead-safe renovation: The state runs its own lead-safe renovation program. It leaves open paint dust disturbed when older walls are cut, patched or sanded, which General Liability answers. Asbestos in wall and ceiling material: A state program reaches removal of this material. It leaves open disturbing older joint compound, wallboard or plaster, which General Liability answers. Workers’ compensation: Required for covered employers, bought in the open market. It leaves open a crew member hurt on the job, which Workers’ Compensation answers. Notes: A license, registration or certification is a requirement of the state, not insurance. The conclusion reads: State rules decide who may do the work and how; the policies decide who pays when something goes wrong. No figures are shown.

Nearby states we also write

Mississippi drywall contractor insurance questions

Our commercial bids run from a single office repair to a full floor of partitions. Where does the Board’s license start?

When the contract reaches the line the commercial law sets. The statute’s definition of a contractor leaves out contracts and subcontracts below a dollar figure, as the Mississippi State Board of Contractors reprints it, so a smaller job falls outside the commercial license. Above the line, the Board’s specialty for metal studs and hanging and finishing board is the classification that fits. As advice, check each contract’s value against the Board’s current reprint before you price it, and count change orders that could push it over.

Exterior stucco repair keeps showing up in our commercial bids. Can we price it under the drywall classification?

Not on the Board’s list. Lathing, plastering and stucco is a separate commercial specialty, and the Board marks it as requiring a test, while the drywall specialty describes studs, board and finishes made for drywall products. If plaster and stucco are a regular part of your commercial work, ask the Mississippi State Board of Contractors which classifications your license should carry.

On a house, the electrician and the plumber need licenses at any job size. Is drywall on that same list?

No. The residential law, as the Board reprints it, licenses subcontractors on home projects at any dollar amount only in the electrical, plumbing, mechanical and heating and air conditioning trades. Drywall is not on that list, and the Board lists no residential drywall classification. A builder’s own license is a separate question, and so is any city or county permit, which you should check where the house sits.

We priced a basement finish straight to the homeowner. Does the price of the job decide whether we need a remodeler license?

Yes, the total cost of the improvements decides it. The residential law calls a business that undertakes improvements to an existing home a remodeler once the cost passes the line it states, and the Mississippi State Board of Contractors licenses residential remodelers through a tested classification. Below the line, the state license does not reach the job.

Before we cut out a damaged ceiling in a house built decades ago, what does the state need to hear from us?

If the house falls under the lead rule and the work disturbs paint, the Mississippi Department of Environmental Quality asks for a lead-based paint project notification ahead of the regulated work, and the firm needs the state’s firm certification with a certified renovator. The state rule’s definition of renovation names the removal of walls and ceilings, so tear-out is inside it.

An office tenant wants its old textured ceiling scraped and skimmed. What has to happen before our crew touches it?

First, someone has to find out what is in it. The department’s guidance names ceiling texture among the places asbestos is found, and the state rule bars anyone without the state’s certificate from working on an asbestos project in a commercial building. Ask the building owner for an asbestos inspection first, and if regulated material turns up, plan on a certified abatement contractor removing it before your crew goes in.

Our crew swells in the busy season and shrinks after it. How do we tell whether the comp law reaches a company our size?

The Mississippi Workers’ Compensation Commission draws the line at a headcount of regularly employed workers in its facts document. Below it, coverage is voluntary; at or above it, the employer must insure with an insurance company or self-insure with the Commission’s approval. The Mississippi State Board of Contractors also asks for proof of coverage on its license application at the same headcount. As advice, count everyone you employ regularly before deciding you are under the line, and ask the Commission if a seasonal or occasional hire leaves you unsure.

A general contractor asked who regulates the agency behind our certificates. What should we tell them?

The Mississippi Insurance Department is the state’s insurance regulator. Anyone can also look up an insurance agency’s license, ours included, on NIPR.com.

This page describes insurance for drywall contractors operating in this state. It is general information, not legal advice and not a statement of coverage. Licensing, lead-safe and asbestos requirements change; verify current requirements with the agency named before relying on them.

Get a quote for your Mississippi drywall work

Tell us how large your contracts usually run, whether you sign with builders, owners or homeowners, how old the walls you open tend to be and who is on the payroll, and we will build the program from those answers.